KitchenRenovation
Guide2025
Everything you need to know about planning, budgeting, and executing a successful kitchen renovation. From initial inspiration to final installation, this comprehensive guide covers every step of the process.
Planning your kitchen renovation
1. Define Your Goals
Start by identifying what you want to achieve:
- More storage and workspace
- Better layout and workflow
- Modern appliances and technology
- Updated style and finishes
- Increased property value
2. Set Your Budget
Establish a realistic budget early. Consider:
- Kitchen units and cabinetry (30-35% of total)
- Appliances (15-20% of total)
- Worktops (10-15% of total)
- Installation and labour (15-20% of total)
- Plumbing, electrical, and building work (10-15% of total)
- Contingency fund (10-15% for unexpected costs)
See our detailed kitchen prices guide for more information.
3. Research and Inspiration
Gather inspiration from magazines, websites, and showrooms. Create a mood board of styles, colours, and features you love. Visit our Fareham showroom to see kitchen ranges, materials, and finishes in person.
Design development
Initial Consultation
Book a consultation to discuss your vision, lifestyle, and requirements. We'll measure your space, understand your cooking habits, and explore design options. This typically takes 1-2 hours and can be at our showroom or your home.
3D Visualisations
Our designers create detailed 3D CAD drawings showing your new kitchen from every angle. You'll see exactly how it will look, how the layout works, and how materials and finishes come together. This process typically takes 2-4 weeks.
Material Selection
Choose cabinetry finishes, worktops, appliances, and hardware. We'll help you select materials that match your style, budget, and lifestyle. Visit our showroom to see and feel samples in person.
Installation process
Preparation
Before installation begins, we'll coordinate with any builders or tradespeople needed for structural work, plumbing, or electrical updates. We ensure everything is ready for a smooth installation.
Installation Timeline
Typical installation takes 1-2 weeks:
- Day 1-2: Remove old kitchen, prepare space
- Day 3-5: Install new units and cabinetry
- Day 6-7: Fit worktops and appliances
- Day 8-10: Final connections, testing, and finishing touches
Minimal Disruption
We work efficiently to minimise disruption to your daily life. Our team keeps the work area clean and organised, and we'll discuss temporary kitchen arrangements if needed during the renovation.
Kitchen renovation checklist
Planning
- Define goals and requirements
- Set realistic budget
- Research styles and materials
- Book initial consultation
- Measure existing space
Design
- Review 3D visualisations
- Select materials and finishes
- Choose appliances
- Finalise layout
- Approve design and place order
Preparation
- Arrange building work if needed
- Order appliances
- Plan temporary kitchen setup
- Clear existing kitchen
- Coordinate tradespeople
Installation
- Remove old kitchen
- Install new units
- Fit worktops
- Connect appliances
- Final inspection and handover
Aftercare
- Learn how to care for your kitchen
- Register warranties
- Schedule follow-up visit
- Enjoy your new kitchen!
Common kitchen renovation mistakes to avoid
Insufficient Budget Planning
Always include a contingency fund (10-15%) for unexpected costs. Don't forget to budget for building work, electrical, plumbing, and finishing touches.
Poor Layout Planning
Consider your workflow and how you use your kitchen. The triangle between sink, hob, and fridge should be efficient, and storage should be accessible where you need it.
Inadequate Storage
Plan for more storage than you think you need. Consider tall larders, deep drawers, and clever corner solutions. See our storage solutions for ideas.
Skipping Professional Design
Professional design ensures your kitchen works perfectly for your space and lifestyle. 3D visualisations help you see potential issues before installation begins.
Let's Plan Your
Kitchen Renovation
Book a consultation to discuss your kitchen renovation project. We'll guide you through every step, from initial planning to final installation.
Loved by homeowners
“We are absolutely delighted with the kitchen the design for which we developed with Matt’s great patience over a long period of time. The result has given us the perfect layout for our needs. Matt took great care to inform us of progress and the process of installation.”
Adrian Hannen